• |
  • Contact Us

  • Contact Information
  • Online Message
  • Recruitment
  • |
  • CHENJA  OAEmail

    028-62590080

    CH|EN|JA  OA|Email

    News
    Release time:
    2019/05/20 14:04
     TNSC Announces Investment in Ally Hi-Tech
    Abstract:
    Taiyo Nippon Sanso Corporation (“TNSC”) announces investment to Ally Hi-Tech Co., Ltd. (“ALLY”) on Mar, 2019.
    Release time:
    2019/04/22 11:46
    Mr. Wang Yeqin, Chairman of Ally Hi-Tech Co. Ltd., gave a speech at the First International Conference on Hydrogen Energy and Fuel Cell Industry in Chengdu, of  "Technology and Cost Analysis of Different Ways to obtain Hydrogen"
    Abstract:
    AttendTheLectureRecently,attheinvitationoftheFirstInternationalConferenceonHydrogenEnergyandFuelCellIndustryinChengdu,WangYeqin,chairmanofAllyHi-TechCo.Ltd,participatedintheGlobalConferenceonHydrogenE
    Release time:
    2019/04/19 16:32
    Ally Hi-Tech Co. Ltd. Attended 2019 Japan International Hydrogen Energy and Fuel Cell Exhibition
    Abstract:
    InSpringof2019Mr.WangYeqin,chairmanofAllyHi-TechCo.,Ltd.,ledaneliteteamwiththelatesthydrogenproductionproductstoparticipateinthe15thJapanInternationalHydrogenEnergyandFuelCellExhibition,hostedbytheRee
    Release time:
    2019/03/19 17:07
    450Nm3/h Methanol Cracking Hydrogen Production Unit in India Provided by Ally Hi-Tech Co. Ltd. Passed the Acceptance Test
    Abstract:
    450Nm3/hMethanolCrackingHydrogenProductionUnitinIndiaProvidedbyAllyHi-TechCo.Ltd.PassedtheAcceptanceTest Allyundertookthe450Nm3/hmethanolcrackinghydrogenplantprojectcontractedwithIndiain2018. Theproje
    Release time:
    2018/05/24 10:18
    Happy Birthday, Ally Hi-Tech Co. Ltd.
    Abstract:
    Ally Hi-Tech Co., Ltd. was established on September 18, 2000. Today we celebrated its 18th anniversary. We wish the company be prosperous and do well everyday!
    Release time:
    2018/05/24 10:15
    Ally Hi-Tech Co. Ltd. Participated in Bank of China SME Business Symposium
    Abstract:
    In order to understand the difficulties and needs of SMEs, the Bank of China listens to the suggestions and opinions of SMEs on financing for SMEs. On September 5, 2018, the head office of the Bank of
    Release time:
    2018/05/24 10:11
    Ally Hi-Tech Contracted 40000Nm3/h Methanol-Hydrogen Plant Launched Successfully and In Operation
    Abstract:
    This is the largest project of the methanol hydrogen production plant of our company. Under the circumstances of tight time schedule, high construction standard, strict environmental protection requir
    Release time:
    2018/05/24 10:09
    The project of 1200Nm3/h hydrogen plant from chlor alkali tail gas by Ally Hi-Tech Co. Ltd. has been successfully accepted.
    Abstract:
    The project of 1200Nm3/h hydrogen plant from chlor alkali tail gas by Ally Hi-Tech Co. Ltd. has been successfully accepted.
    Release time:
    2018/05/24 10:08
    Ally Hi-Tech Co. Ltd.’s High Sales Record and Bright Future
    Abstract:
    In the slow recovery of the industry in 2018, in the face of fierce competition in the market, Ally recently made a new record. From the fourth quarter of 2017 to the first quarter of 2018, Ally has
    Release time:
    2018/05/24 10:07
    Good News
    Classification:
    News
    Headline:

    Good News

    Abstract:
    The National Standard GB-T 34540-2017 of Technical Requirements for Pressure swing Adsorption Hydrogen Production System of Methanol Conversion, edited by our company, was officially approved and rele
    Release time:
    2018/05/24 10:04
    The 460000Nm 3/h desulphurization plant for Lanzhou Coal by Ally is successfully completed.
    Abstract:
    The 460000Nm 3/h desulphurization plant for Lanzhou Coal by Ally is successfully completed.
    Release time:
    2018/05/24 10:03
    20Kw Fuel Cell On-line Hydrogen Supply System in Taiwan in Operation
    Abstract:
    The 20Kw fuel cell on-line hydrogen supply system, developed jointly by our company and Taiwan partners, has passed the acceptance test by government in the Nanshan Area of Taipei, providing
    Release time:
    2018/05/11 14:49
    The first set of hydrogen plant from carbide furnace tail gas has been successfully commissioned.
    Abstract:
    Congratulations on the successful start-up of the Xinjiang Shengxiong hydrogen production project from calcium carbide furnace tail gas on Oct. 07, 2016. Due to the tight schedule and the new
    Release time:
    2018/05/11 13:48
    The 1500 Nm3/h methanol hydrogen production plant, which was built by Ally in 2013 for the Wenchang Satellite Launching Center i
    Abstract:
    The 1500 Nm3/h methanol hydrogen production plant, which was built by Ally in 2013 for the Wenchang Satellite Launching Center in Hainan, will provide hydrogen fuel for the launch mission.
    Release time:
    2018/05/11 13:42
    The Sichuan Beifang-Hongguang 6000Nm3/h natural gas-hydrogen plant built by Ally was successfully commissioned on January 5, 201
    Abstract:
    The Sichuan Beifang-Hongguang 6000Nm3/h natural gas-hydrogen plant built by Ally was successfully commissioned on January 5, 2016.
    Release time:
    2018/05/11 13:40
    The Shandong Huidong 30000Nm3/h methanol-hydrogen production plant designed by Ally has been successfully commissioned on Januar
    Abstract:
    The Shandong Huidong 30000Nm3/h methanol-hydrogen production plant designed by Ally has been successfully commissioned on January 15, 2016. Now it is running normally with qualified indicators.
    Release time:
    2018/05/11 13:39
    New methanol hydrogen production (with catalytic combustion heating) device has been successfully commissioned.
    Abstract:
    The 100Nm3/h hydrogen plant in Zhejiang with application of the patented technology "Methanol Steam Hydrogen Production Process with Catalytic Combustion of Flue Gas as Heat Source"
    Release time:
    2018/05/11 13:37
    Production expansion of the natural gas hydrogen production plant for HP in Bangladesh
    Abstract:
    In 2003, Ally exported a natural gas hydrogen plant to HP Company in Bangladesh and commissioned it successfully. With the increase of market demand we were requested to expand the capacity of the pla
    Release time:
    2018/09/28 10:12
    0.6m³/h liquid hydrogen plant built by Ally provided power for Xichang Chang
    Abstract:
    At 1:30 a.m, December 2, 2013, the Long March III B carrying Chang'e III was launched from the Xichang Satellite Launch Center with direction at the moon. (Fig. 1)